Rated 3 out of 5 stars

why some email to task convert maintain the related link to the e mail but some dont?

furthermore, some have a link when converting to task.. but after saving and then opening the task.. the related link (that links back and open the corresponding a mail) is erased. and also start /or end date is not ticked too even i thick when i do the conversion

This review is for a previous version of the add-on (91.0.1).